A five-year ERP program typically costs 3 to 5 times first-year software, and most of where a program lands in that range is decided during selection, before a single line of the build starts.
ERP Strategy Partners editorialLast reviewed November 8, 2026
A five-year ERP program typically costs 3 to 5 times first-year software, ERP Research reports, with implementation alone running 1 to 3 times that first-year figure. Where a given program lands inside that range is set mostly during selection, by three decisions made before the systems integrator has written a line of configuration: how tightly customization is scoped, which SI is chosen and on what fee structure, and how much design discipline the requirements register carries into the build.
Customization scope is set in the requirements register, not in the build
Holding customization to under 10 to 15% of requirements saves 20 to 40% of implementation cost, ERP Research reports. That saving is available at exactly one point: when the requirements register is being written and tagged, before any vendor has quoted against it. A register that lists every function the business performs, rather than the lines that actually differentiate one vendor from another, is the single most common way this saving gets lost before the SI is even picked.
The SI is 40 to 60% of the bill, and the selection is where it gets picked
SI fees run 40 to 60% of total implementation cost, ERP Research reports, which makes the systems integrator the largest single line in most programs. A selection that scores the SI on its own criteria, separately from the software, and checks its proposed staffing against named people rather than a generic role list, is making the single decision with the largest effect on the whole five-year number. A selection that treats the SI as an afterthought to the software choice is not.
Design phase discipline is where the first two decisions either hold or slip
Design is a small share of hours, 10 to 20% of the total, ERP Research reports, but it is where a tight requirements register either survives contact with the build or does not. A fit-gap conversation that reopens "why not just customize this" for every line the register tagged as standard is a design phase quietly re-inflating the customization share the selection worked to hold down.